Hotel Mirabell

History of the Building Project

The hotel complex consists of two historic buildings dating from 1852 and 1853. The especially beautiful facade of the south building is a protected historic monument, as is the vaulted stairwell with pilasters. Part of the ensemble will be preserved, whilst old and new elements, hand in hand, will lead to a promising future.

What is planned?

It is planned to renovate the listed building stock and to add a new building. An investor is currently being sought.

Current Project Status

After an interruption of over one year, the demolition work, with the exception of the historically listed features, is concluded.

Straubingerplatz
Straubingerplatz
This listed hotel ensemble from the Belle Époque is being renovated and a new tower added.
Vertical Link
Vertical Link
A pedestrian tunnel is being planned that will connect the “Plateau” station and Stubnerkogel lifts with the old town center.
the cōmodo
the cōmodo
Planned is a modern, hip hotel project “The Comodo” with around 70 rooms.
Hoteldorf Grüner Baum
Hoteldorf Grüner Baum
The main building was constructed in 1929, constantly expanded throughout the years.